Rail Trail is finished and open to the public. |
Trail |
Future Rail Trail is passable to walkers and off-road bicycles. Dirt road or woodchipped path. May be missing crossing signs, landscapping, safety fences, etc. |
Trail |
ROW (Right of Way) may be difficult to travel for several reasons: No construction started, property ownership issues, , no easy access, active construction site, etc. |
Trail |
ROW closed for various reasons: Private propery closed to public, missing bridge over river, active construction site, etc. |
Trail |
Street Crossing |
Street |
River Crossing |
River |
Description |
Trail Status |
Length |
|
L I N C O L N S T R E E T - M A R L B O R O U G H |
. |
T R A I L |
0.25 miles |
3.66 miles to downtown Hudson |
H U D S O N S T R E E T |
The Marlborough trail parking is on Hudson Street, one block north of the trailhead on Lincoln Street. It is a city owned parking lot, next to a small commercial building. |
|
Parking Lot |
. |
T R A I L |
0.37 miles |
|
A S H S T R E E T |
. |
T R A I L |
0.35 miles |
|
F A I R B A N K S B L V D |
This was the first section of the trail to open, in May 2001. |
T R A I L |
0.73 miles |
|
The Cul-de-Sac at the end of Sasseville Way has space for 6 cars to park. |
|
Street Parking |
F I T C H B U R G S T R E E T |
This section was opened in the Fall of 2003. |
T R A I L |
0.48 miles |
|
I-290 C O N N E C T O R ( E A S T ) |
The bike tunnel under the 4-lane highway is 75 feet long. It was completed in October 2004 and paved in June 2005. |
Trail Tunnel |
|
I-290 C O N N E C T O R ( W E S T ) |
|
T R A I L |
0.9 miles |
|
The Route 85 trail parking lot has 20 spaces. It is located on the west side of RT-85 and is next to Advance Auto Parts. |
|
Trail Parking Lot |
RT-85 & W A S H I N G T O N S T R E E T - H U D S O N |
. |
T R A I L |
0.4 miles |
|
A S S A B E T R I V E R |
B R I D G E |
Bridge finished in the summer of 2006. |
. |
T R A I L |
0.18 miles |
Downtown Hudson is 2 blocks from the trail crossing at Broad Street. |
There are 13 parking spaces on South Street, 100 feet west of the trail crossing at Broad and South Streets. |
Street Parking |
B R O A D S T R E E T |
. |
T R A I L |
0.14 miles |
3.66 miles to the trail head at downtown Marlborough.
1.46 miles to the Wilkins Street parking lot at the Stow Town line.
|
G R O V E S T R E E T |
. |
T R A I L |
0.2 miles |
|
T O W E R S T R E E T |
. |
T R A I L |
0.36 miles |
|
The Route 62 trail parking lot has 15 spaces. |
|
Trail Parking Lot |
. |
T R A I L |
0.25 miles |
|
RT-62 & M A I N S T R E E T |
. |
T R A I L |
0.21 miles |
|
C O X S T R E E T |
. |
T R A I L |
0.3 miles |
5.12 miles to Marlborough |
The Wilkins Street trail parking lot has 25 spaces. |
|
Trail Parking Lot |
W I L K I N S S T R E E T |
Contranautics (private property) |
R O W |
|
|
M A R B O R O U G H R O A D - Hudson/Stow Town Line |
Railroad Ave. |
R O W |
|
|
A S S A B E T R I V E R |
No bridge |
Honey Pot Farms |
R O W |
|
|
A S S A B E T R I V E R |
No bridge |
|
R O W |
|
|
S U D B U R Y R O A D |
Crow Island / Track Road in Stow (Stow recreational easement across private property) |
R O A D |
1.9 miles |
|
W H I T E P O N D R O A D - Stow/Maynard Town Line |
Track Road in Maynard. Town recreational property. Paved bike trail. |
T R A I L |
0.5 miles |
|
G R E A T R O A D RT-117 |
Paved trail |
T R A I L |
0.25 miles |
|
S U D B U R Y S T R E E T |
Mill & Main parking lot. Paved path |
T R A I L |
0.1 miles |
|
M A I N S T R E E T |
Railroad Street. bike lane is finished. |
T R A I L |
0.1 miles |
|
F L O R I D A R O A D |
Robbins Park, footbridge across Assabet River, town parking lot. |
T R A I L |
0.1 miles |
|
S U M M E R S T R E E T |
Paved trail |
T R A I L |
0.2 miles |
|
C O N C O R D S T R E E T |
Paved trail (2017 construction) |
T R A I L |
0.5 miles |
|
A C T O N S T R E E T - Maynard/Acton Town Line |
Paved trail (2017 construction) |
T R A I L |
0.4 miles |
1.3 miles to South Acton |
B E A C O N B U I L D I N G |
Paved trail (2017 construction) |
T R A I L |
0.7 miles |
0.9 miles to South Acton MBTA parking lot |
Trailhead parking lots have 11 spaces (weekdays) and 33 spaces (weekends). |
|
Trail Parking Lots |
M A P L E S T R E E T |
M B T A RR Station L O T |